Jedburgh Golf Course risks
Jedburgh is quite a hilly course in places so buggy drivers should take great care particularly when crossing slopes at an angle. Where necessary, buggies are directed to follow a specific course to minimise the risks.
Many holes are parallel to each other and some shots cross other fairways. However, the course is fairly open so it is possible to see other golfers and be aware of their actions. It is an individual golfer’s responsibility to play only when it is safe to do so.
All holes are described looking from the tee to the green
———————————————————————————————————————————–
1st hole
First half of fairway fairly steep down the ditch crossing the fairway.
Be aware of golfers playing the 3rd hole.
Bridges must be used to cross the ditch.
Second half of fairway, potential for being hit by balls driven from the 17th tee.
Green located close to 17th tee
2nd hole
As you walk from the 1st green to the 2nd tee be aware of the group in front driving from the 2nd tee.
Also be aware of players driving from the 16th tee or playing from the 16th fairway as the 16th green is close to the 2nd tee.
There is a well-used road behind the 2nd and alongside the right hand side of the 2nd fairway.
Be aware of players on 1the 1st green or the group behind walking to the 2nd tee.
3rd hole
Out of bounds along the right hand side of the hole with a well-used road behind the hedge parallel to the fairway.
Fairly steep hill from the tee until the fairway flattens out.
The Clubhouse and car park are situated behind the 3rd green.
Be aware of golfers and wayward shots from the 1st tee and fairway.
4th hole
Out of bounds over the wall down the right hand side of the fairway.
Ditch crosses the fairway just in front of the 4th tee.
Cross the ditch using the bridge.
Out of bounds also over the wall behind the 4th green where there is a footpath.
5th hole
Shots from the Gents medal tee cross the 4th and 18th fairways, so be aware of golfers on both these holes. Shots from the Gents yellow tees and from the ladies tee also cross the 19th fairway.
The 5th fairway runs parallel to the 17th fairway in the opposite directions. For a part of the fairway there is a ditch between the holes. Be aware of players on the 17th fairway.
The 15th tee is not far from the right hand side of the 5th fairway.
The 5th green is not far from the 1st green with the outside possibility of stray shots coming onto the 5th fairway.
6th hole
The walk from the 5th green to the 6th tee crosses the 15th fairway not far from the 15th tee, so be aware of players on the 15th tee.
There is a ditch crossing the 6th fairway.
There are significant patches of gorse to the right of the first part of the 6th fairway.
Be aware of players on the 7th hole.
There is a road behind the 6th green – the wall behind the green forms the boundary of the course.
Take care on steep approach to the 6th green.
7th hole
There is a small pond at the front of the 7th green (?)
Be aware of players on the 6th fairway when driving from the 7th tee.
8th hole
Players should take the designated path from the 7th green to the 8th tee.
There is a pond in front of the 8th green. Players should not enter the pond to look for balls.
Access the 8th green by passing to the left of the pond.
There are significant areas of gorse alongside both sides of the 8th fairway.
9th hole
There is a ditch crossing the 9th fairway. Golfers should use the bridges to cross the ditch.
Be aware of golfers and buggy drivers on the 10th who take the long route round the valley to get onto the second part of the 10th fairway. They will pass close to the 8th fairway.
There is a steepish climb up to the 9th green.
10th hole
There is a very steep slope from the 9th green to the 10th tee. Buggy drivers should take particular care and follow any signed route.
There is steep up and down on the direct route from tee to green. Buggies should take to loner route down towards the 9th tee and then left on to the second part of the 10th fairway.
There is a steep slope up from the bottom of the dip to the 10th green.
Behind the 10th green there may be golfers walking from the 12th green to the 13th tee.
11th hole
Over the wall to the right of the 11th fairway is out of bounds. There is a footpath on the far side of that wall running parallel to the fairway.
The path from the 12th green to the 13th tee passes in front of the 11th tee. Be aware of players taking that path.
The 11th fairway runs parallel to and in the opposite direction to the 12th fairway. Be aware of players on the 12th fairway.
12th hole
The fairway runs parallel to and in the opposite direction to the 11th fairway. Be aware of players on the 11th fairway.
The wall or fence to the right of the 11th fairway forms a boundary of the course.
When leaving the 12 green to go to the 13th tee be aware of golfers on the 11th tee and players approaching the 10th green.
13th hole
The wall to the left of the 13th fairway forms a boundary of the course. There is a footpath parallel to and just over the wall.
The fairway slopes quite steeply down towards the green. Take care when driving a buggy.
There is a deep pond in front of the 13th green. Do not enter the pond to look for balls.
Approach the 13th green to the right of the pond.
14th hole
The 14th tee is fairly close to the 18th medal tee so be aware of players on the 18th tee.
The area in front of the 14th tee can be quite damp; take care in wet conditions.
15th hole
When walking to the 15th tee from the 14th green take great care when passing through the wall to be aware of possible drives from the 15th tee. If there are players on the 15th green, golfers coming from the 14th green should wait till the tee is clear before going to the tee.
The fairway on the 15th is fairly steep uphill.
There is a road behind the 15th green.
Be aware of golfers on the 16th tee.
16th hole
The wall to the right of the 16th fairway forms a boundary of the course. Behind the wall there is a road.
The 16th green is very close to 1st green and the 2nd tee. Be aware of golfers walking from the 1st green to the 2nd tee and golfers driving off the 2nd tee.
17th hole
The 17th tee is very close to the 1st green and the drive is down a fairway shared by the 1st and the 17th. Players on 1st will be walking towards the 17th tee. Do not drive until it is safe to do so.
The second half of the 17th fairway runs parallel to and in the opposite direction to the 5th fairway. Be aware of players on the 5th.
There are a number of ditches parallel to or crossing the 17th fairway. Cross the ditches using the bridges provided.
18th hole
The walk from the 17th green to the 18th tee crosses the 5th fairway. Be aware of players driving from either of the tees on the 5th. Cross the ditch by bridge.
The drive from the 18th tee crosses the 5th fairway. Only drive when it is safe to do so.
The 18th fairway is fairly steep uphill and comes within range of wayward shots from the 4th and 1st tees so be aware of golfers on these holes.
The Clubhouse is immediately behind the 18th green.
———————————————————————————————————————————–
There is a defibrillator at the Clubhouse. When open, the Clubhouse phone number is 01835 863587





